Stanford Hawk Secures a 5 year Contract with Total E&P in Angola

Dubai, UAE, 3 February 2014: Stanford Marine, a leading regional offshore marine business, announced today from its Dubai headquarters that it has secured a 5-year contract with Total E&P Angola for Stanford Hawk, the latest addition to its fleet.

Total E&P Angola (“TEPA”) awarded Stanford Marine a 5 year contract, with two 2 year options, scheduled to commence by the beginning of February 2014. The Stanford Hawk will be supporting the process and storage activities of TEPA, by transporting personnel and cargo, as well as assisting in safety standby duties.

Stanford Marine’s GM, Darren Reeves, said ‘Having the Stanford Buzzard, an 87m PSV, in East Africa and now the Stanford Hawk in West Africa allows us to strengthen our presence on the continent and provides a platform to deploy more vessels in the region if the right opportunity arises.’

Built by Fujian Mawei Shipyard in China, the 75 meter Stanford Hawk is a DP2 diesel electric Platform Supply Vessel (“PSV”) with a deadweight of 3300 tons, a FiFi 1 notation and spacious accommodation for a maximum complement of 52 persons onboard. With an open deck area of 700m2 and the support of a 5t crane, Stanford Hawk is capable of carrying approximately 1750 tons of cargo on deck. The vessel has under deck capacities of 1287m3 of fuel, 800m3 of fresh water, 1538m3 of water ballast, 497m3 of brine and 230m3 dry bulk tanks.

Propulsion comes from four Cummins generators each rated at 1800kw, delivering a maximum speed of 14 knots. Installed with DP state-of-the-art Kongsberg K-Master, the vessel has the following reference systems: 3 x Gyro compass, 2 x DGPS, 1 x Cyscan, 1 x radius, 3 x wind sensors and 3 x VRUs.

The vessel sailed to Angola after a two-week stay in Dubai, where contract-specific modifications were completed. These included special removable boat landing and floating hoses. 

© 2024 Stanford Marine Group. All Rights Reserved.

Scroll to Top